Saturday, April 17, 2010

Steering Mock-Up


The rigging has started ! The center line reference was located with a framing square, level and tape measure. The rudders will be set up at 8" off center. Rudder brackets were drilled and mocked-up.

Friday, April 16, 2010

Paint finished




Here is the paint in the finished state. Rat Fink and pin striping has been added. Holes for the shaft log have been drilled and tapped. A quick overall buff job, wash and it is ready for rigging