The rigging has started ! The center line reference was located with a framing square, level and tape measure. The rudders will be set up at 8" off center. Rudder brackets were drilled and mocked-up.
Here is the paint in the finished state. Rat Fink and pin striping has been added. Holes for the shaft log have been drilled and tapped. A quick overall buff job, wash and it is ready for rigging