The rigging has started ! The center line reference was located with a framing square, level and tape measure. The rudders will be set up at 8" off center. Rudder brackets were drilled and mocked-up.
Here is the paint in the finished state. Rat Fink and pin striping has been added. Holes for the shaft log have been drilled and tapped. A quick overall buff job, wash and it is ready for rigging
The bottom is completely finished. It was color sanded to 2000 grit, then polished. The speckles and film "wool fibers" want to stick to the hull because of static. This part of the project came out great !